EcoBuild construction process
Our process

From dream to turnkey home

Seven steps, maximum 16 weeks. Transparent, stress-free, and fully guided by our team.

01
Orientation
Week 1
02
Design
Week 2–3
03
Permit
Week 3–12
04
Production
Week 3–14
05
Transport
Week 14–15
06
Placement
Week 15–16
07
Handover
Week 16+
01
Orientation Β· Week 1

Free consultation

You contact us and tell us about your plot, wishes, and budget. Our advisor makes an initial sketch and global cost estimate. No obligations.

  • Telephone or video consultation (30 min)
  • Plot and zoning plan check
  • Global cost scan with all items
  • Choice of home type and size
Orientation β€” Free consultation
02
Design Β· Week 2–3

Personal design & quote

Based on the consultation, our design team creates a personalised design. You receive a complete 3D visualisation and an all-in quote with a fixed price.

  • 3D floor plans and visualisations
  • Choice of facade cladding, roof, and colour
  • All-in quote (no surprises)
  • Optional tour of reference projects
Design β€” Personal design & quote
03
Permit Β· Week 3–12

Permit application & approval

EcoBuild takes care of the complete permit application with your municipality. While we wait for approval, we schedule the production. You are kept informed at every step.

  • Complete permit documentation
  • Engineering stamps and certificates
  • Periodic status updates via app
  • Average 8–12 weeks lead time
Permit β€” Permit application & approval
04
Production Β· Week 3–14

Manufacturing in our factory

As soon as you approve the design, production starts in our ISO 9001-certified factory in North Macedonia. Each module is fully finished before shipment.

  • CNC machining of wooden frames
  • Installation of insulation, utilities, and windows
  • Electrical wiring & plumbing
  • Quality control on 47 checkpoints
Production β€” Manufacturing in our factory
05
Transport Β· Week 14–15

Delivery to your location

The completed modules are transported by special truck to your plot. For most Benelux locations, transport time is 2–3 days from North Macedonia.

  • GPS tracking of your truck
  • Notification 48 hours in advance
  • Crane coordination and location preparation
  • Own transport insurance
Transport β€” Delivery to your location
06
Placement Β· Week 15–16

Assembly in 1–3 days

Our specialised assembly team places and connects the modules on your foundation. Most homes are up in 1–3 working days. After that, connection to utilities follows.

  • Crane placement of modules
  • Connection and waterproofing of seams
  • Connection of electricity, water, and sewage
  • Final exterior finish
Placement β€” Assembly in 1–3 days
07
Handover Β· Week 16+

Key handover & warranty

After a full inspection, we hand over the keys. You receive a digital dossier with all certificates, warranty documents, and maintenance instructions.

  • Joint inspection and punch list
  • Explanation of utilities and smart home
  • Digital residents' book
  • 10-year warranty on installations, 30-year on construction
Handover β€” Key handover & warranty
Lead time

Total lead time: 8–16 weeks

Consultation & Design
Permit application
Factory production
Transport
Placement & Handover
Week 1Week 4Week 8Week 12Week 16
Start today

Begin with step 1

The free consultation takes 30 minutes and obligates you to nothing. Afterwards, you will know exactly what is possible for your plot and budget.

Request free consultation